| S.No |
Project |
Port Name |
Project Cost (Rs. in Crores) |
Capacity in MTPA |
| 1 |
Container Terminal, NSICT. |
Jawaharlal Nehru Port Trust |
600.00 |
13.2 |
| 2 |
BPCL Jetty |
Jawaharlal Nehru Port Trust |
200 |
5.5 |
| 3 |
Third Container Terminal |
Jawaharlal Nehru Port Trust |
900 |
15.6 |
| 4 |
Bulk Cargo berths No. 5A & 6A |
Mormugao Port Trust |
250
|
5.0
|
|
5
|
Fifth
Oil Jetty (IFFCO)
|
Kandla
Port Trust
|
21.50
|
2.0
|
|
6
|
Oil
Jetty related facilities at Vadinar (ESSAR)
|
Kandla
Port Trust
|
750.00
|
12.0
|
|
7
|
Oil
Jetty awarded to M/s IOCL
|
Kandla
Port Trust
|
20.70
|
2.0
|
|
8
|
Container
Freight Station
|
Kandla
Port Trust
|
41.07
|
3.0
|
|
9
|
Container
Terminal (Phase I& II )
|
Kandla
Port Trust
|
446.54
|
7.2
|
|
10
|
Container
Terminal (Berth No. 7).
|
Tuticorin
Port Trust
|
100.00
|
5.0
|
|
11
|
Container
Terminal, Outer harbour.
|
Visakhapatnam
Port Trust
|
108
|
1.6
|
|
12
|
Multipurpose
Berths- EQ-8 & EQ-9
|
Visakhapatnam
Port Trust
|
196.00
|
6.0
|
|
13
|
Captive
Fertilizer Berth
|
Paradip
Port Trust
|
26.17
|
4
|
|
14
|
Mechanisation
of Cargo Handling Project-1 at Paradip Port
|
|
37.32
|
2
|
|
15
|
Mechanisation
of Cargo Handling Project-2 at Paradip Port
|
Paradip
Port Trust
|
25.13
|
2
|
|
16
|
Container
Terminal at Chennai
|
Chennai
Port Trust
|
469
|
8
|
|
17
|
Construction
of Single Point Mooring Captive Berth
|
Paradip
|
500
|
15
|
|
18
|
Development
of Second Container Terminal.
|
Chennai
Port Trust
|
495.00
|
9.6
|
|
19
|
Marine
Liquid Terminal
|
Ennore
Port Ltd.
|
249
|
3.00
|
|
20
|
Multipurpose
Berth No. 4A
|
Kolkata
Port Trust
(HDC)
|
150.0
|
3
|
|
21
|
Multipurpose
Berth No. 12
|
Kolkata
Port Trust
|
30.07
|
0.45
|
|
22
|
Mechanisation
at HDC berth no 2
|
Kolkata
Port Trust
|
75
|
4
|
|
23
|
Mechanisation
at HDC berth no 8
|
Kolkata
Port Trust
|
75
|
4
|
|
24
|
Crude
Oil handling facility
|
Cochin
Port Trust
|
720
|
7.5
|
|
|
Total
|
|
6485.5
|
140.65
|
|
S.No
|
Project Name
|
Department/Agency
|
Estimated Project Cost (Rs. in Crores)
|
Capacity in MTPA
|
|
1
|
International
Container Transshipment
Terminal
(ICTT)
|
Cochin
Port Trust
|
2118
|
36
|
|
2
|
LNG Re-gasification Terminal at
Cochin.
|
Cochin
Port Trust
|
3195
|
2.5
|
|
3
|
Coal
Terminal
|
Ennore
Port Limited
|
399
|
8
|
|
4
|
Iron
Ore Terminal
|
Ennore
Port Limited
|
480.00
|
12
|
|
5
|
Construction
of two new off Shore container berths and development of
container terminal on BOT basis in Mumbai Harbour.
|
Mumbai
Port Trust
|
1460.00
|
9.6
|
|
6
|
Construction of Captive Jetty for
handling Coal by M/s. NPCL
|
New Mangalore Port Trust
|
230
|
3.0
|
|
7
|
Construction of Coal Berth at NBW
for NLC – TNEB
|
Tuticorin Port Trust
|
49
|
6.3
|
|
8
|
Development of 13th
multipurpose cargo berth (other than liquid and container cargo
berth)
|
Kandla Port Trust
|
188
|
2
|
|
9
|
Construction of Deep
Draft Iron Ore Berth
|
Paradip Port Trust
|
591
|
10
|
|
10
|
Construction of Deep
Draft Coal Berth.
|
Paradip Port Trust
|
479
|
10
|
|
11
|
Setting up of
Mechanised Iron Ore Handling Facilities at Berth No- 14.
|
New Mangalore Port Trust
|
277.11
|
6.62
|
|
12
|
Development of Berth
no- 7 for handling bulk cargo.
|
Mormugao Port Trust
|
252
|
7
|
| 13 |
Development of Western quay(WQ-6) in the northern arm of Inner harbour of VPT for handling Dry bulk cargo |
Vizag |
114.37 |
2 |
| 14 |
Development of EQ-10 berth in Inner Harbour for handling liquid cargo. |
Vizag |
55.38 |
1.85 |
| 15 |
Mechanised Coal handling facilities at General cum Cargo Berth(GCB) in the Outer Harbour |
Vizag |
444.10 |
10.18 |
| |
Total(1 to 15) |
10331.96 |
127.05 |
|
S.No.
|
Project Name
|
Port Name
|
Est. Cost (In Rs Crore )
|
Est. Capacity In MTPA
|
|
1
|
Development of
Container Terminal.
|
Ennore
|
1407
|
15
|
|
2
|
Conversion of berth no-
8 as Container Terminal.
|
Tuticorin
|
312.23
|
6
|
|
3
|
Development of 14th to
16th multipurpose cargo berth (other than liquid and container
cargo berth)
|
Kandla
|
567.5
|
6
|
|
4
|
Multi purpose berth
at Port Trust Project
|
Paradip Port Trust
|
387.31
|
5.0
|
|
5
|
Mechanization of Central Quay-III
Berth
* Single stage bidding
|
Paradip Port Trust
|
40.00
|
4.0
|
|
6
|
Installation of
Mechanised handling facilities for fertilizers at EQ 7 in the
Inner Harbour
|
Visakhapatnam Port Trust
|
217.58
|
5.21
|
|
7
|
Development of
Container Terminal
|
NMPT
|
275.82
|
4.24
|
|
8
|
Creation of Mega
Container Terminal
|
Chennai
|
3125
|
48
|
|
9
|
Installation of
Mechanised handling facilities at WQ 8 at Vizag
|
Visakhapatnam Port Trust
|
208.87
|
4.60
|
|
10
|
Installation of
Mechanised handling facilities at WQ 7 at Vizagv
|
Visakhapatnam Port Trust
|
213.87
|
4.50
|
|
11
|
Development of
standalone container handling facility with a quay length of 330 m
North of NSICT Terminal
|
JNPT
|
600
|
9.6
|
|
12
|
4th Container Terminal
|
JNPT
|
6700
|
57.6
|
|
13
|
Construction of North
Cargo Berth No- II at Tuticorin
|
Tuticorin
|
332.16
|
5
|
|
14
|
Development of EQ1 in East Dock
|
Visakhapatnam Port Trust
|
265.52
|
5.95 |
|
15
|
Development of EQ1-A in
East Dock at Vizag
|
Visakhapatnam Port Trust
|
269.71
|
6.7
|
|
16
|
Development
and operation of 2 Berth at Indira Dock as dry bulk cargo
terminal- at Mumbai
|
Mumbai
Port Trust
|
45
|
0.6
|
|
17
|
Development
and operation of a Berth at Indira Dock- as conventional cargo
terminal at Mumbai
|
Mumbai
Port Trust
|
30
|
0.6
|
|
18
|
Creation of berthing
and allied facilities of Tekkra near Tuna (outside Kandla Creek) -
Phase-I
|
Kandla Port
Trust
|
1136.63
|
12
|
|
19
|
Setting up of Single
Point Mooring ( SPM ) and allied facilites off Veera in Gulf of
Kutch – Kandla
|
Kandla
Port Trust
|
830
|
9
|
|
20
|
Construction of
1 riverine jetty downstream of 2nd
Oil Jetty / 47.11
|
Kolkata Port Truat
|
47
|
1.5
|
|
21
|
Construction of 1 riverine jetty upstream of 3rd Oil Jetty / 99.46
|
Kolkata Port Truat
|
99
|
2.5
|
|
22
|
Constn. of shallow
draught Berth(3 Nos)
|
Tuticorin
|
50
|
0.8
|
|
23
|
Mechanization of
Construction of Berth 9
|
Tuticorin
|
20
|
5.0
|
|
24
|
International
Bunkering Terminal - Construction of Multi-purpose Liquid Terminal
|
Cochin
|
184.20
|
4.5
|
|
25
|
International Cruise
Terminal Cum Public Plaza
|
Cochin
|
55
|
-
|
|
26
|
Construction of two
berths at Vasco Bay
|
Mormugao
|
120
|
5.0
|
|
27
|
Development of
Bulk handling Terminal west of breakwater (>WoB)
|
Mormugao
|
721
|
12
|
|
Total (1 to 27)
|
18260.4
|
240.9
|